How Long Does a Custom Pool Build Take? What Homeowners Need to Know

A residential backyard pool construction in White Bear Lake, MN showing workers assembling a rectangular in-ground pool. A Royal Pool and Spa logoed excavator is parked nearby, and the surrounding area is filled with dirt piles and construction materials.

Dreaming of transforming your backyard into a personal oasis? If a custom pool is on your wishlist, you’re probably wondering, How long will it take to build? While the exact timeline depends on several factors, most homeowners are pleasantly surprised that the process is quicker than they expect.

Let’s explore what influences the timeline and what to expect when working with Royal Pool & Spa.

Key Factors That Affect Pool Installation Time

Building a custom pool involves several stages, and each step impacts the overall timeline. Here are the main factors that determine how long your pool installation will take:

  • Scheduling: The process begins with securing a spot in the pool builder’s schedule. Availability can vary depending on the season, so booking early is essential.
  • Design Process: Finalizing your pool design depends on the project’s complexity and your personal preferences. Simple designs take less time, while intricate, custom features may require additional planning.
  • Permits: Acquiring permits is a necessary step. Local authorities need to review and approve the design before construction can begin.
  • Construction: This phase includes preparing the site, excavating, installing walls and plumbing, assembling components, and finishing both the pool and surrounding areas.
  • Filling and Testing: Filling the pool depends on its size and water source, while testing ensures that all equipment functions correctly.

How Long Does Pool Construction Take?

Once construction begins, most pool projects take between four to five days to complete. The timeline can vary based on factors such as:

  • Pool type (vinyl liner, fiberglass, or concrete/gunite)
  • Number of inspections required
  • Project scope and customization

What Can Delay the Pool Installation Process?

While pool builders strive to stay on schedule, certain factors can cause delays, including:

  • Weather Conditions: Rain can saturate the soil, making it unsuitable for excavation. Wind can interfere with plaster or concrete applications, and extreme heat can cause materials to dry too quickly, leading to cracks.
  • Soil Composition: Clay-rich soil takes longer to dry after rainfall compared to sandier soil.
  • Scheduling Conflicts: Because pool builders often work on multiple projects during the limited construction season, delays on one job can impact others.

Choosing the Right Pool Builder Matters

Partnering with an experienced and reliable pool builder is essential to ensuring your project stays on schedule.

Ready to Make a Splash? Let’s Build Your Dream Pool!

If you’re ready to elevate your outdoor space with a custom pool, Royal Pool & Spa is here to help. Serving homeowners throughout the Minneapolis/St. Paul metro area since 1988, we specialize in creating stunning, tailor-made pools designed to fit your lifestyle.

Get started today by:

📞 651-779-7606

📩 Send us a message

🖼️ Explore our photo gallery to see the beautiful pools we’ve created!